Gallery: Itapu Oil Field FPSO Leaves Shipyard (Brazil)

Bartolomej Tomic

October 18, 2022

Gallery: Itapu Oil Field FPSO Leaves Shipyard (Brazil)
©Sembcorp Marine

Estaleiro Jurong Aracruz (EJA), a Brazilian subsidiary of Singapore's Sembcorp Marine, has completed the construction of the P-71 FPSO, integrating topsides on the China-built hull.

The new FPSO vessel left the EJA shipyard on Tuesday. It will be deployed at Petrobras' ultra-deepwater Itapu field in Brazil’s Santos Basin. 

When operational, the P-71 will produce up to 150,000 barrels of oil per day (BOPD).The P-71 measures 316m by 54m and can store 1.6 million barrels. The FPSO can accommodate 166 people.

Estaleiro Jurong Aracruz's P-71 work scope included the construction of six modules, pipe-racks, and a flare, and integrating them onto the vessel along with other modules and items supplied by Petrobras. EJA also modified FPSO’s topsides and hull to meet Itapu field requirements.

The hull of the FPSO was built in China by CIMC Raffles and arrived in Brazil in March, 2020.

 


Anchor Handler Construction: What to Expect as Floating Wind Picks Up

August 16, 2023

Anchor Handler Construction: What to Expect as Floating Wind Picks Up

German Maritime Fleet: Resilient Strength in Turbulent Times

March 11, 2025

German Maritime Fleet: Resilient Strength in Turbulent Times

Aker Solutions, Drydocks to Upgrade Petrojarl Knarr FPSO for Deployment at Equinor's Rosebank Field

January 9, 2023

Aker Solutions, Drydocks to Upgrade Petrojarl Knarr FPSO for Deployment at Equinor's Rosebank Field

November 29, 2023

Saipem Inks $1.9B in Contracts

Low Interest Shown in US' First Gulf of Mexico Offshore Wind Auction

August 29, 2023

Low Interest Shown in US' First Gulf of Mexico Offshore Wind Auction

US Offshore Wind Segment Showing No Signs of Slowing Down

June 1, 2022

US Offshore Wind Segment Showing No Signs of Slowing Down